Skip to contentErgasa

Regulatory tracker

Revised

Every row is re-verified against the Official Journal on each revision.

Every dated EU obligation that reaches equipment placed on the European market: what the instrument is, which operators it binds, and what is different the day after.

EU obligations by date
DateInstrumentBindsStatusConsequence
AI Act (EU) 2024/1689Providers and deployers of AI systems that interact with peopleAction requiredThe Article 50 transparency duties apply: a person interacting with an AI system, or with content it generates, must be told so.
Cyber Resilience Act (EU) 2024/2847Manufacturers of products with digital elementsAction requiredActively exploited vulnerabilities and severe incidents must be reported to ENISA and the national CSIRT within 24 hours.
Machinery Regulation (EU) 2023/1230Manufacturers, authorised representatives, importersApproachingDirective 2006/42/EC stops applying: conformity assessment, a technical file and an EU declaration of conformity are required, and a responsible economic operator must be established in the Union before the machine is placed on the market.
AI Act (EU) 2024/1689Providers and deployers of stand-alone high-risk AI systems (Annex III)Not yet applicableDeferred from 2 August 2026 by Regulation (EU) 2026/1744. Risk management, technical documentation, human oversight and registration in the EU database become enforceable.
Cyber Resilience Act (EU) 2024/2847Manufacturers, importers and distributorsNot yet applicableNo product with digital elements may be placed on the EU market without CE marking against the Regulation's essential cybersecurity requirements.
AI Act (EU) 2024/1689Providers of high-risk AI embedded in regulated products (Annex I)Not yet applicableDeferred from 2 August 2027 by Regulation (EU) 2026/1744. The same obligations reach AI that is a safety component of machinery already covered by the sectoral legislation in Annex I.
Source: Official Journal of the European Union. Dates are dates of application, not of entry into force.

Action required: in force, or within the 90-day window. Approaching: inside the 365-day planning horizon. Not yet applicable: beyond it.